The multipurpose building at the California Montessori Project charter school consists of construction of a new, slab on grade modular gymnasium with administration building and restroom wing. The building totaled 8,800 square feet and included a full basketball court, 2,000 sf administrative wing, a 1,500 sf restroom, physical education office and warming kitchen wing. The gymnasium had 20’ column heights with a 26’ peak height. JL Modular was able to deliver the project in 3-1/2 months by utilizing prefabricated modular systems, extra manpower and an escalated schedule.
Construction of three new buildings at the football field including ticket booth building, restroom, concessions, and storage building and a new weight room.
UC Berkeley selected JL Construction as design-build contractor for the renovation of Blue Oak Ranch Reserve, a scientific research site on Mt. Hamilton in Santa Clara County.
JLC, with its architect partners, transformed the simple research site with a vintage barn and temporary living trailers into a state-of-the-art facility capable of accommodating 50 people with two faculty residences, four cabins and eight seasonal cabins. The utility infrastructure consists of a massive off-the-grid solar array, battery backup power, generators, solar hot water heaters, septic system, water storage and fire sprinkler pumps. The barn was renovated with a research lab, accessible bathrooms and showers, large commercial kitchen and presentation space.
Due to the remote site, all of the buildings were constructed in JL Modular’s manufacturing facility and placed on-site.
Construction of 8,000 square foot building featuring a group kitchen, library and activity area plus nine bedrooms and offices for administration and support staff. Walls and roofs were prefabricated in JL Modular's manufacturing facility. Panelized walls and roof were assembled on-site and then finish work was completed.
Faced with a growing enrollment and aging buildings, this school district took the ambitious approach of demolishing over half of their existing campus to build 26 new classrooms in two separate buildings. The district chose to use the design-build delivery for the two-phase construction, which also included a central quad.
In Phase I, JL Modular was hired to design and build a new two-story 28,000 square foot classroom building. The two-story building consisted of 20 classrooms, 4 restrooms, a teacher's lounge, an interior corridor, and an elevator. Phase II added an 8,000 square foot single-story classroom building.
The entire 32,000 square foot project was completed in 7 months, minimizing the amount of time students had to spend in temporary portable classrooms.
This project consisted of construction a new one-story modular administrative building and modernization of two existing two-story administrative buildings.
This project at the luxury Carneros Inn resort and spa in Napa Valley included construction of new meeting and conference rooms, restaurant, pool, exercise rooms, offices, and associated site work, which included storm water retention basin, highway traffic signal, and improvements.
Construction of three health clinic modular buildings and one modular administration building for an exisiting state prison. Clinic modular buildings also contained temporary holding cells for inmates.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |