The new, 7,200 square foot, kindergarten classroom building replaces aging portables at the Richard Crane Elementary School, part of the Cotati-Rohnert Park Unified School District.
JL Modular worked closely with WLC Architects of Emeryville, CA, on the design which features partition walls, to give educators a 21st century collaborative learning environment. Green features include state -of-the-art lighting and electrical systems, extensive daylighting and recycled materials used throughout the building.
Design-build delivery of a new, modular, two-story visual and performing arts building featuring six standard classrooms, three studio art rooms, dance studio, ceramics studio with outside kilns, and associated restrooms and offices. JL Modular worked with the district and AEDIS Architects to design and build the new modular classroom building.
Three building campus totaling 7,000 square feet. Features include a four-classroom building, admin building with teacher’s lounge, and multipurpose/gathering building with divider wall and warming kitchen. Buildings feature extensive green elements including clerestories and Solatubes for natural lighting.
Design-build delivery of a new 11,000 square foot STEM building including, Science, Biology, Chemistry and Construction Technology Classrooms. Included restrooms, science prep rooms, chemical storage, double loaded corridor, large covered outdoor work area and covered entry. Plaster and Hardie exterior finish with storefront windows, sunshades and built up roof.
The new Vicente-Briones School is 13,000 square foot building, serving the Martinez Unified Adult and Continuation Schools. The building features six classrooms, cafeteria with warming kitchen, offices for administration and outdoor eating and gathering space.
The Fremont Unified School District contracted JL Modular for construction of this two story modular school building containing twelve general classrooms, 30’x32’ each. JL Modular also built a learning court, removed and replaced the lunch shelter and added new parking with drop-off area. This project was developed using design-build project methodology to add value, flexibility, and save time.
Construction of a new two-story modular classroom building totaling 14,640 square feet and all associated site work. The building features five kindergarten classrooms with associated bathrooms and six standard classrooms plus a teachers office and observation room. Project delivery is Design-Build.
Design-build delivery of a new 19,200 square foot, two story modular classroom building. Includes six kindergarten classrooms and ten standard classrooms. The project utilized prefabricated wood shear wall panels, floors and roofs in order to be constructed under a six month timeline.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |