Project consisted of construction of three new buildings including two classrooms and a school administration building. Project includes all related site work and new building construction and JLM completed work in seven weeks.
This project at the luxury Carneros Inn resort and spa in Napa Valley included construction of new meeting and conference rooms, restaurant, pool, exercise rooms, offices, and associated site work, which included storm water retention basin, highway traffic signal, and improvements.
Shoreline Unified School District chose JL Modular to build a new music and math classroom building utilizing modular construction at the West marin School. The two buildings were built in just under two months over the summer to allow the school district to occupy the buildings for the new school year. The structure replaced two aging portables to give the school permanent classrooms that matched the aesthetics of the school and would last just as long.
The music building features a large 10-foot double door that opened to a small amphitheater to allow students to practice and perform just outside of the music room.
The SCOE Community School is a new campus consisting of two new classroom wings built to form an interior courtyard and play area. JLM constructed the new buildings utilizing slab on grade modular buildings with a site built metal stud wall with custom curved track tops between each classroom to give the campus a Southwestern look. The landscaping was completed with palm trees, succulents, and desert tone pavers and plaster to complete the look.
The Community School included administrative offices, a warming kitchen, gymnasium, child care, and classrooms. The metal roofs had Solatubes for natural daylight and thin film solar panels to provide the majority of the school’s power. The project was built to LEED requirements, but certification was not pursued by the District.
Construction of three health clinic modular buildings and one modular administration building for an exisiting state prison. Clinic modular buildings also contained temporary holding cells for inmates.
The East Bay Municipal Utilities District chose JL Modular to replace their temporary portable ranger station with a state of the art, net zero energy use modular headquarters. Net zero means the building has zero net energy consumption and zero carbon emissions annually.
Relevant features include modular structure on a slab-on-grade foundation, mechanically stabilized earth retaining walls, state of the art passive heating and cooling system using earth tube design, concrete slab with radiant heating and cooling coils, graywater systems, rainwater storage tank with night sky spray system for cooling, clerestory windows, energy-efficient HVAC systems, maximum natural lighting, energy efficient lighting fixtures with day lighting controls, and solar power system.
JL Modular constructed two new modular buildings at Henry Hall Middle School containing over 9,000 square feet of new classrooms.
The uniqueness of this project is that the two buildings were constructed facing each other, and were then connected with aluminum storefront and a Kalwall skylight to create an interior corridor between the two classrooms. The classrooms had upper clerestory windows so that light from the corridor could filter into the classrooms.