Delivered via design-build, the $51 million TK-8th grade school was built on a 12-acre site by a partnership of JL Modular, Otto Construction and NMR Architects. Completed in 2021, the new two-story school features three buildings with 35 classrooms and an administration/ library building. It serves 850 students.
This project used permanent modular construction techniques, which combine the form and function of traditional site-built construction with the
speed and cost efficiency of the modular construction process. The steel-framed buildings were pre-fabricated in modular sections off-site that were transported to the site, erected and finished. This method helped shorten the overall construction schedule and kept costs down.
JL Construction, with its affiliate JL Modular, built the new 2-Story, 15,600 square foot modular building with 10 integrated science labs and 6 prep rooms. Support spaces include student and staff restrooms on both
floors, electrical room, elevator, exterior stairs and balcony.
The building and related sitework and landscaping was installed and completed while school was fully operational.
Construction of a new modular two-story classroom building on an occupied school campus. The new classroom building includes eleven classrooms, two student restrooms and ancillary spaces totaling 11,760 square feet.
Mabel Mattos Elementary School is a two building campus which is designed to be expanded to an 800-student elementary school.
The two-story steel frame buildings connected by a metal staircase were designed by AEDIS Architects and total 19,258 square feet.
The first phase features:
• A two-story modular classroom building with eight classrooms
• An adjacent two-story administration building
• All underground utilities for future phases
One and two-story modular classroom buildings for charter school campus in San Jose, CA. The two-story classroom building is a structural steel frame on a permanent foundation with 18 classrooms plus a learning lab, elevator and restrooms. The single-story modular building is a wood-frame shear-wall design which houses classrooms plus school administration offices and storage. Both buildings total 24,000 square feet. Project delivery is modular design-build.
Design-build delivery of a new, modular, two-story visual and performing arts building featuring six standard classrooms, three studio art rooms, dance studio, ceramics studio with outside kilns, and associated restrooms and offices. JL Modular worked with the district and AEDIS Architects to design and build the new modular classroom building.
The Fremont Unified School District contracted JL Modular for construction of this two story modular school building containing twelve general classrooms, 30’x32’ each. JL Modular also built a learning court, removed and replaced the lunch shelter and added new parking with drop-off area. This project was developed using design-build project methodology to add value, flexibility, and save time.
Construction of a new two-story modular classroom building totaling 14,640 square feet and all associated site work. The building features five kindergarten classrooms with associated bathrooms and six standard classrooms plus a teachers office and observation room. Project delivery is Design-Build.
Design-build delivery of a new 19,200 square foot, two story modular classroom building. Includes six kindergarten classrooms and ten standard classrooms. The project utilized prefabricated wood shear wall panels, floors and roofs in order to be constructed under a six month timeline.