The new two-story modular classroom features 14 general classrooms, four STEM classrooms, boys & girls restrooms, food service speedline and a staff work room.
Three new slab-on-grade modular classroom and administration buildings as part of a campus modernization for a middle school. Building design was JL Modular’s DSA prechecked design for faster approval.
The administration building houses reception, offices, a staff lounge, and a community room. One classroom building features four standard classrooms plus restrooms. The other classroom building has three science classrooms and a culinary arts classroom
JL Construction, in partnership with JL Modular, designed and built a classroom building and multipurpose building for this K-8 school. The classroom building is a single story, 7200 square foot, permanent modular building including site work. Each of the six STEM classrooms is 1,100 square feet and features extensive daylighting and adjacent outdoor learning areas. The architect used JL Modular’s DSA prechecked design to ensure prompt DSA approval and faster construction. The new, 8,600 square foot modular multipurpose building features a 5,000 square foot assembly room, warming kitchen, changing rooms, restrooms and overhead doors that open to adjacent playgrounds. Site work included converting a field to two outdoor basketball courts, a new concrete amphitheatre, a play structure and lunch area.
The new Vicente-Briones School is 13,000 square foot building, serving the Martinez Unified Adult and Continuation Schools. The building features six classrooms, cafeteria with warming kitchen, offices for administration and outdoor eating and gathering space.
The multipurpose building at the California Montessori Project charter school consists of construction of a new, slab on grade modular gymnasium with administration building and restroom wing. The building totaled 8,800 square feet and included a full basketball court, 2,000 sf administrative wing, a 1,500 sf restroom, physical education office and warming kitchen wing. The gymnasium had 20’ column heights with a 26’ peak height. JL Modular was able to deliver the project in 3-1/2 months by utilizing prefabricated modular systems, extra manpower and an escalated schedule.
Renovations to buildings J & K and new construction of the Agriculture and Culinary Arts Buildings. Construction of three new buildings and remodel of two existing buildings to provide Career Technical Education training for high school students.
Based on the Roseland Modular Library project, Persinger Architects returned to JL Modular to construct two new buildings in Point Arena. The structures utilized the same design as Roseland, with a large monitor roof and windows for natural light, and were used as a library and a cafeteria.
The cafeteria building featured a small warming kitchen, serving line and buffet, and custom concrete stained floors throughout the cafeteria seating area. The library featured custom cabinetry, shelving, reception desk and book drop, as well as two large seating areas for group reading.
JL Modular designed and built two new modular buildings for this school's campus.
The multi-use building is a 7,500 square foot structure consisting of a full court basketball court, stage, cafeteria, warming kitchen and library.Special roof frames were designed to create a 56’ clear span and 22’ overall height to allow for the basketball court. The open, 5,000 square foot gym and stage area allows the space to be used for basketball and volleyball games, physical education classes, plays, performances and assemblies, and for cafeteria seating. The 1,000 square foot warming kitchen included a walk in refrigerator and freezer and overhead coiling counter doors from the kitchen to the multi-use room to serve the students. The 1,500 square foot library and computer lab has it’s own separate entrance and custom built shelving, reception and book return casework.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |