JLC Jeff Luchetti Construction, Inc.
JL Modular, Inc.

CONTACT US

707.527.5788
  • Home
  • Experience
    • Complete Campuses
    • One-Story Classroom Buildings
    • Two-story Classroom Buildings
    • TK and Kindergarten Classrooms
    • STEM and STEAM Classroom
    • Multipurpose and Specialty Buildings
    • Food Service Buildings
  • PRODIGi21
  • About Us
    • JL Construction
    • JL Modular
    • General Contractor
    • Design-Build
    • Manufacturing Facility
    • Careers
  • Blog
  • Contact

STEM and STEAM Classroom

Projects › STEM and STEAM Classroom:
Rex Fortune Elementary School
Location: Roseville, CA
Client: Center Joint Unified School District
Architect: AC Martin

Rex Fortune Elementary School, named for a late superintendent of the school district, Dr. Rex Fortune, opened with a ribbon cutting ceremony on August 7, 2023.
In six separate buildings JL Modular’s 35 classrooms range from TK and Kindergarten classrooms to, general education and STEAM classrooms. All 35 of the permanent modular classrooms feature state-of the-art educational and security elements including TV monitors, led lighting, and floor-to-ceiling whiteboards. The robotics classroom features garage-style folding doors so students can connect to the outside outside learning.
Using JLM’s DSA-prechecked classroom design JL Modular worked closely with architect AC Martin and site contractor Clark/Sullivan to deliver the school in time for the 2023 school year.

Hart Middle School Modular Science Building
Location: Pleasanton, CA
Client: Pleasanton Unified School District
Architect: Sugimura Finney Architects

New modular classroom building featuring six science classrooms with associated prep rooms. The project is being delivered on a lease-leaseback contract using JL Modular’s DSA-prechecked classroom designs.

Lydiksen Elementary School New Modular Buildings
Location: Pleasanton, CA
Client: Pleasanton Unified School District
Architect: AEDIS Architects

JL Modular built six permanent modular buildings as follows:
• Administration building: offices, staff lounge,conference room, restrooms, and other support services.
• Campus center building: library, conference rooms, restroom and other support services.
• Kinder Learning cluster: Four kinder learning studios with two learning commons, restrooms and other support services.
• Transitional Kinder building: One learning studio with unisex restroom.
• Elementary Learning clusters: Five learning studios, commons, offices, restrooms and other support services.

Buckingham Collegiate Charter Academy Science Building
Location: Vacaville, CA
Client: Vacaville Unified School District
Architect: Williams + Paddon

New modular science building on an operating campus. There are three standard 960 square foot classrooms and a larger classroom for science and lab use. One classroom is the robotics workshop. The project was completed on an operating campus.

Upper Lake High School Agricultural Sciences and Health and Fitness Buildings
Location: Upper Lake, CA
Client: Upper Lake Union High School District
Architect: WLC Architects

JL Modular built two new custom modular buildings for Upper Lake High School.

The 7,200 square foot Agricultural Sciences Building features a CAD classroom, agricultural classroom, science prep room, welding and auto workshop and an outdoor structure. The building features a roll-up door for indoor/outdoor learning, an extensive HVAC system for the welding equipment, compressed gas storage, and a paint spray booth.

The 5,400 square foot Health and Fitness Building features a room for wrestling and mat sports and a fitness center for weightlifting and team training. The building features a custom sound system, and roll up doors for indoor/outdoor activities.

Tokay High School Modular Classroom Building
Location: Lodi, CA
Client: Lodi Unified School District
Architect: LPA Architects

Two-story classroom building featuring 16 standard classrooms, 4 science classrooms with shared prep rooms, elevator and restrooms. Photos: © 2022 Steve Whittaker

Greenfield High School Modular Classroom Building
Location: Greenfield, CA
Client: South Monterey County Joint Union High School District
Architect: JK Architecture

The new two-story modular classroom features 14 general classrooms, four STEM classrooms, boys & girls restrooms, food service speedline and a staff work room.

Rancho Santana School
Location: Hollister, CA
Client: Hollister School District
Architect: Nichols Melburg & Rossetto

Delivered via design-build, the $51 million TK-8th grade school was built on a 12-acre site by a partnership of JL Modular, Otto Construction and NMR Architects. Completed in 2021, the new two-story school features three buildings with 35 classrooms and an administration/ library building. It serves 850 students.

This project used permanent modular construction techniques, which combine the form and function of traditional site-built construction with the
speed and cost efficiency of the modular construction process. The steel-framed buildings were pre-fabricated in modular sections off-site that were transported to the site, erected and finished. This method helped shorten the overall construction schedule and kept costs down.

Santa Rosa Junior College Petaluma Science Building
Location: Petaluma, CA
Client: Santa Rosa Junior College
Architect: Brokaw Designs

This new 4,500 square foot state-of-the-art college science building was built by a design-build partnership of JL Construction, along with JL Modular and Architect Brokaw Designs. The building is an L-shaped, steel-frame building with a chemistry teaching lab, chemistry prep room, chemistry instrument room and anthropology classroom; an all-gender restroom and extensive outdoor teaching areas.

The chemistry lab features five chemical fume hoods, safety showers and eyewash stations, gas/vacuum dual valves at each station, laboratory sinks, and a reverse osmosis de-Ionized (RODI) water system.

JLC was selected following a rigorous design-build competition. The modular approach by JLC ensured that the project was built quickly for less than conventional construction.

Edna Hill Middle School Science Building
Location: Brentwood, CA
Client: Brentwood Union School District
Architect: Brokaw Design

New permanent modular 8-classroom wing with associated science fixtures and casework. The building features four dedicated science classrooms with sinks and ceiling mounted power cords. There are four additional classrooms with partition walls for flexibility.

Projects › STEM and STEAM Classroom:
1 2 3 Next »

JL Construction Ca. Contractor’s License No. 761270​
JL Modular Ca. Contractor’s License No. 835496

JL Construction
70 Stony Point Road, Suite D, Santa Rosa, CA 95401
707.527.5788 F: 707.542.7718

    • Home
    • Construction Services
    • Custom Design-Build Contractor
    • General Contractor
    • Commercial Construction Projects
    • Modular Construction Information
    • Green Building Services
    • Experience
    • Modular
    • Schools
    • General Construction Companies in Northern California
    • JL Construction
    • JL Modular
    • About
      • Testimonials
      • Manufacturing Facility
      • Careers
    • Blog
    • Contact

Copyright © 2023

Privacy Policy Site Map
This website or its third-party tools process personal data. View our privacy policy here.
In case of sale of your personal information, you may opt out by using the link Do not sell my personal information.
×
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT