The multipurpose building at the California Montessori Project charter school consists of construction of a new, slab on grade modular gymnasium with administration building and restroom wing. The building totaled 8,800 square feet and included a full basketball court, 2,000 sf administrative wing, a 1,500 sf restroom, physical education office and warming kitchen wing. The gymnasium had 20’ column heights with a 26’ peak height. JL Modular was able to deliver the project in 3-1/2 months by utilizing prefabricated modular systems, extra manpower and an escalated schedule.
Construction of three new buildings at the football field including ticket booth building, restroom, concessions, and storage building and a new weight room.
UC Berkeley selected JL Construction as design-build contractor for the renovation of Blue Oak Ranch Reserve, a scientific research site on Mt. Hamilton in Santa Clara County.
JLC, with its architect partners, transformed the simple research site with a vintage barn and temporary living trailers into a state-of-the-art facility capable of accommodating 50 people with two faculty residences, four cabins and eight seasonal cabins. The utility infrastructure consists of a massive off-the-grid solar array, battery backup power, generators, solar hot water heaters, septic system, water storage and fire sprinkler pumps. The barn was renovated with a research lab, accessible bathrooms and showers, large commercial kitchen and presentation space.
Due to the remote site, all of the buildings were constructed in JL Modular’s manufacturing facility and placed on-site.
Based on the Roseland Modular Library project, Persinger Architects returned to JL Modular to construct two new buildings in Point Arena. The structures utilized the same design as Roseland, with a large monitor roof and windows for natural light, and were used as a library and a cafeteria.
The cafeteria building featured a small warming kitchen, serving line and buffet, and custom concrete stained floors throughout the cafeteria seating area. The library featured custom cabinetry, shelving, reception desk and book drop, as well as two large seating areas for group reading.
JL Modular designed and built two new modular buildings for this school's campus.
The multi-use building is a 7,500 square foot structure consisting of a full court basketball court, stage, cafeteria, warming kitchen and library.Special roof frames were designed to create a 56’ clear span and 22’ overall height to allow for the basketball court. The open, 5,000 square foot gym and stage area allows the space to be used for basketball and volleyball games, physical education classes, plays, performances and assemblies, and for cafeteria seating. The 1,000 square foot warming kitchen included a walk in refrigerator and freezer and overhead coiling counter doors from the kitchen to the multi-use room to serve the students. The 1,500 square foot library and computer lab has it’s own separate entrance and custom built shelving, reception and book return casework.
The 5,760 sf Moreland project is a 90 x 64 building consisting of locker rooms, restrooms, PE classrooms, storage space and offices. JL Modular constructed the buildings utilizing slab on grade, modular steel moment frames, light gauge metal stud framing, a plaster exterior and metal roof. The boys and girls locker rooms have heavy duty lockers and epoxy floors for durability in the high use space.
Project consisted of construction of three new buildings including two classrooms and a school administration building. Project includes all related site work and new building construction and JLM completed work in seven weeks.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |