JL Modular built eight new general education and TK and Kindergarten classrooms as part of a portable replacement program for an expanding school district. The design is JL Modular’s Clerestory DSA prechecked design.
JL Modular built six permanent modular buildings as follows:
• Administration building: offices, staff lounge,conference room, restrooms, and other support services.
• Campus center building: library, conference rooms, restroom and other support services.
• Kinder Learning cluster: Four kinder learning studios with two learning commons, restrooms and other support services.
• Transitional Kinder building: One learning studio with unisex restroom.
• Elementary Learning clusters: Five learning studios, commons, offices, restrooms and other support services.
New modular science building on an operating campus. There are three standard 960 square foot classrooms and a larger classroom for science and lab use. One classroom is the robotics workshop. The project was completed on an operating campus.
As part of a campus modernization JL Modular built six new modular classroom buildings at Lorin Eden Elementary School. They were designed with HY Architects using JLM’s DSA-prechecked plans. The buildings house the school’s administration offices, kindergarten and TK classrooms, standard classrooms, science classroom and restroom building.
JL Modular built two new custom modular buildings for Upper Lake High School.
The 7,200 square foot Agricultural Sciences Building features a CAD classroom, agricultural classroom, science prep room, welding and auto workshop and an outdoor structure. The building features a roll-up door for indoor/outdoor learning, an extensive HVAC system for the welding equipment, compressed gas storage, and a paint spray booth.
The 5,400 square foot Health and Fitness Building features a room for wrestling and mat sports and a fitness center for weightlifting and team training. The building features a custom sound system, and roll up doors for indoor/outdoor activities.
New three classroom modular building as part of the school’s expansion. The design utilized JL Modular’s DSA prechecked design to ensure rapid approval and on-time delivery.
This new 4,500 square foot state-of-the-art college science building was built by a design-build partnership of JL Construction, along with JL Modular and Architect Brokaw Designs. The building is an L-shaped, steel-frame building with a chemistry teaching lab, chemistry prep room, chemistry instrument room and anthropology classroom; an all-gender restroom and extensive outdoor teaching areas.
The chemistry lab features five chemical fume hoods, safety showers and eyewash stations, gas/vacuum dual valves at each station, laboratory sinks, and a reverse osmosis de-Ionized (RODI) water system.
JLC was selected following a rigorous design-build competition. The modular approach by JLC ensured that the project was built quickly for less than conventional construction.
Built in 12 months on a fast-track schedule, Riego Creek is an entirely new school to accommodate Roseville’s growing population. JLC, in conjunction with JL Modular and DCA Architects, designed and built the school using JL Modular’s Prodigi21 DSA prechecked classroom design.
Features include:
-6 Kindergarten and TK classrooms with play structure
-3 learning community clusters organized by grades with outdoor learning space and shade structures
-28 classrooms plus associated restrooms, small group instruction rooms
-4000 square foot multipurpose building with warming kitchen and stage
-Administration building with associated offices
New permanent modular 8-classroom wing with associated science fixtures and casework. The building features four dedicated science classrooms with sinks and ceiling mounted power cords. There are four additional classrooms with partition walls for flexibility.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |