Built in 12 months on a fast-track schedule, Riego Creek is an entirely new school to accommodate Roseville’s growing population. JLC, in conjunction with JL Modular and DCA Architects, designed and built the school using JL Modular’s Prodigi21 DSA prechecked classroom design.
Features include:
-6 Kindergarten and TK classrooms with play structure
-3 learning community clusters organized by grades with outdoor learning space and shade structures
-28 classrooms plus associated restrooms, small group instruction rooms
-4000 square foot multipurpose building with warming kitchen and stage
-Administration building with associated offices
JL Construction and its affiliate JL Modular, oversaw this project which was completed with school completely operational during the entire project.
The addition added three new permanent modular buildings. The first building is the administration which serves as the focal point for the entry. The building includes receptions, offices and faculty meeting rooms. Two new buildings house three kindergarten and three transitional kindergarten (TK) classrooms and associated restrooms. The building design was a proprietary JL Modular design which is pre-approved by the Division of the State Architect which ensures faster approval and construction.
Construction of three new modular classroom buildings including art, kindergarten and special education classrooms. The architect used JLM’s DSA prechecked design to ensure prompt Division of the State Architect approval and faster construction.
JL Modular designed and built seven classroom buildings plus an administration building for this complete school replacement. There are a total of 21 classrooms plus associated restrooms. The classroom design used JL Modular’s DSA prechecked clerestory design to save design and approval times and ensure the classrooms would be open on the first day of school in August 2019. The administration building features a welcoming school entrance, community room, administration offices and conference rooms.
JL Construction, in partnership with JL Modular, designed and built a classroom building and multipurpose building for this K-8 school. The classroom building is a single story, 7200 square foot, permanent modular building including site work. Each of the six STEM classrooms is 1,100 square feet and features extensive daylighting and adjacent outdoor learning areas. The architect used JL Modular’s DSA prechecked design to ensure prompt DSA approval and faster construction. The new, 8,600 square foot modular multipurpose building features a 5,000 square foot assembly room, warming kitchen, changing rooms, restrooms and overhead doors that open to adjacent playgrounds. Site work included converting a field to two outdoor basketball courts, a new concrete amphitheatre, a play structure and lunch area.
As part of a portable replacement JL Modular was tasked with designing and building a new classroom building to provide two new kindergarten classrooms on this existing elementary School campus. JLM worked with the architect to use our clerestory DSA prechecked design to expedite approval. The building features two kindergarten classrooms with associated teacher work rooms and restrooms.
Mabel Mattos Elementary School is a two building campus which is designed to be expanded to an 800-student elementary school.
The two-story steel frame buildings connected by a metal staircase were designed by AEDIS Architects and total 19,258 square feet.
The first phase features:
• A two-story modular classroom building with eight classrooms
• An adjacent two-story administration building
• All underground utilities for future phases
The new school for the Woodland Joint Unified School District was built by JL Modular in conjunction with HMC Architects and Otto Construction.
JLM was responsible for the construction of the modular buildings including the:
• administration building
• three kindergarten classrooms
• eight classrooms with adjacent collaboration spaces and restrooms
• a student center with library
JLM worked with HMC Architects to design and build the classroom buildings within one of JLM’s standard customizable classroom designs, which is preapproved by the California Division of the State Architect. This preapproval saved months in design and approval time.
The school offers a unique STEAM and project-based learning program that builds 21st-century skills. Design features and unique architectural elements include:
• Collaboration space between classrooms
• Limited built-ins for flexible use of classroom space
• Mobile furniture for adaptable spaces
• Natural lighting from windows
• Outdoor learning areas
• Mixed-use student center
One and two-story modular classroom buildings for charter school campus in San Jose, CA. The two-story classroom building is a structural steel frame on a permanent foundation with 18 classrooms plus a learning lab, elevator and restrooms. The single-story modular building is a wood-frame shear-wall design which houses classrooms plus school administration offices and storage. Both buildings total 24,000 square feet. Project delivery is modular design-build.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |