Construction of three new modular classroom buildings including art, kindergarten and special education classrooms. The architect used JLM’s DSA prechecked design to ensure prompt Division of the State Architect approval and faster construction.
Construction of a new modular two-story classroom building on an occupied school campus. The new classroom building includes eleven classrooms, two student restrooms and ancillary spaces totaling 11,760 square feet.
Five new slab-on-grade permanent modular classrooms and all associated site work were completed under a lease-leaseback agreement. Classroom design utilized the JL Modular DSA prechecked plan, a turnkey solution from design to construction.
Construction of four 1-story modular classrooms, locker room, wood shop and art classroom buildings. The architect used JL Modular's DSA prechecked design to ensure prompt DSA approval, and faster construction.
JL Modular designed and built seven classroom buildings plus an administration building for this complete school replacement. There are a total of 21 classrooms plus associated restrooms. The classroom design used JL Modular’s DSA prechecked clerestory design to save design and approval times and ensure the classrooms would be open on the first day of school in August 2019. The administration building features a welcoming school entrance, community room, administration offices and conference rooms.
JL Modular designed and built three classroom buildings at Stanley Middle School using its DSA prechecked design. Two buildings are configured to make an l-shape which converges around an established outdoor learning area. The other six classrooms are on the opposite side of the campus. The classroom types include general education and science with prep rooms, eye wash, movable furniture and science-specific countertops. The buildings also feature student and faculty restrooms and a conference room with partition wall for optional divider.
The new 7,335 square-foot, multipurpose building serves the Public Safety Training Center as an assembly area, practice area for tactical arts, and workout facility for firefighting trainees, and police cadets. JL Modular is the design builder with WLC Architects. Features include: mat rooms, operable partition, restrooms and covered walkway connecting it to the rest of the campus.
JL Construction, in partnership with JL Modular, designed and built a classroom building and multipurpose building for this K-8 school. The new, 8,600 square foot modular multipurpose building features a 5,000 square foot assembly room; warming kitchen, changing rooms, restrooms and overhead doors to open to adjacent playgrounds. Site work included converting a field to two outdoor basketball courts, a new concrete amphitheatre, a play structure and lunch area.