This project consisted of construction a new one-story modular administrative building and modernization of two existing two-story administrative buildings.
Construction of a new modular classroom building and all associated site work. The building features five new classrooms and exterior restrooms. Each classroom has extensive natural daylighting and Solatubes for natural light and energy efficiency.
Modernization of an existing grammar school building and construction of a four new single story wood framed structures with a cedar siding exterior and a metal roof totaling 45,000 sf. Also includes on and off site construction at street, parking lot and play areas.
JL Modular designed and built two new modular buildings for this school's campus.
The multi-use building is a 7,500 square foot structure consisting of a full court basketball court, stage, cafeteria, warming kitchen and library.Special roof frames were designed to create a 56’ clear span and 22’ overall height to allow for the basketball court. The open, 5,000 square foot gym and stage area allows the space to be used for basketball and volleyball games, physical education classes, plays, performances and assemblies, and for cafeteria seating. The 1,000 square foot warming kitchen included a walk in refrigerator and freezer and overhead coiling counter doors from the kitchen to the multi-use room to serve the students. The 1,500 square foot library and computer lab has it’s own separate entrance and custom built shelving, reception and book return casework.
The 5,760 sf Moreland project is a 90 x 64 building consisting of locker rooms, restrooms, PE classrooms, storage space and offices. JL Modular constructed the buildings utilizing slab on grade, modular steel moment frames, light gauge metal stud framing, a plaster exterior and metal roof. The boys and girls locker rooms have heavy duty lockers and epoxy floors for durability in the high use space.
With an increasing enrollment and a tight site, San Francisco Unified School District had to build vertical to get the additional space they needed. They chose to build a new two story building with 11 classrooms and a teacher’s lounge utilizing modular construction and teamed with JLC for their fourth design-build project together. The ambitious project was completed in a 14-month timeline including bidding, design, DSA approval and all site work and new construction of the two story classroom building.
The building itself was built utilizing slab on grade, modular floor and roof frames and prefabricated wall panels allowing construction to be completed in less than 5 months. A separate elevator and stair tower was built so that the elevator would be incorporated into the building. The building was built right next to the existing classroom building so that they could be connected with expansion joints and share elevators, stairs, and teacher workroom facilities.
Project consisted of construction of three new buildings including two classrooms and a school administration building. Project includes all related site work and new building construction and JLM completed work in seven weeks.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |