The new child development center consists of a new 6,650 gsf educational facility with a 3,500 square foot play yard that will serve approximately 40 children ages 3 to 36 months in four program rooms. The building is to be a one-story pre-fabricated modular structure built on a concrete slab. The prefabrication process will accommodate a compressed construction schedule. The project site, including the adjacent parking lot, will be re-contoured to facilitate construction, accessibility and emergency egress. At the University's request, the project is targeted for a LEED Silver certification.
With their current campus being a maze of ancient portable structures, the East Side Union High School District needed a permanent solution for their Adult Education campus. The solution was a combination of single and two-story modular buildings to be built around a central courtyard.
JLM took on the design-build project utilizing their traditional steel moment frame design for the single story buildings, and a prefabricated structural steel and metal wall framed design for the two story buildings. The new buildings provided 20 new classrooms, a full administrative office building, a student lounge building, a book room, and two computer labs.
The multipurpose building at the California Montessori Project charter school consists of construction of a new, slab on grade modular gymnasium with administration building and restroom wing. The building totaled 8,800 square feet and included a full basketball court, 2,000 sf administrative wing, a 1,500 sf restroom, physical education office and warming kitchen wing. The gymnasium had 20’ column heights with a 26’ peak height. JL Modular was able to deliver the project in 3-1/2 months by utilizing prefabricated modular systems, extra manpower and an escalated schedule.
JL Modular developed this two-story modular 21st century classroom building totaling 10,880 square feet with eight classrooms, two science labs, teacher workroom and two accessible restrooms. The building is structural steel with metal stud framing, standing seam metal roof, stucco finish and tile exterior. The building features high ceilings and large windows with clerestory windows on the second floor, an exterior walkway with two stairways and an elevator. The exterior finish features a tile wainscot that wraps around the building to match the exterior of the existing school buildings.
The classroom building features the 21st century learning environment with encourages a collaborative learning environment. They utilize Nana Wall folding doors which open up two classrooms into a large innovative and adaptive learning area. The classrooms also have custom cabinetry with integrated teaching walls and a modern Audio Visual systems.
Construction of three new buildings at the football field including ticket booth building, restroom, concessions, and storage building and a new weight room.
UC Berkeley selected JL Construction as design-build contractor for the renovation of Blue Oak Ranch Reserve, a scientific research site on Mt. Hamilton in Santa Clara County.
JLC, with its architect partners, transformed the simple research site with a vintage barn and temporary living trailers into a state-of-the-art facility capable of accommodating 50 people with two faculty residences, four cabins and eight seasonal cabins. The utility infrastructure consists of a massive off-the-grid solar array, battery backup power, generators, solar hot water heaters, septic system, water storage and fire sprinkler pumps. The barn was renovated with a research lab, accessible bathrooms and showers, large commercial kitchen and presentation space.
Due to the remote site, all of the buildings were constructed in JL Modular’s manufacturing facility and placed on-site.
Construction of two all new modern modular classroom buildings totaling 16,000 square feet which included 12 classrooms, a flex learning space and corridor, and restrooms.
Construction of three new classroom buildings totaling 3,840 square feet. Includes two standard middle school classrooms and a music classroom including a large band room, instrument storage and sound attenuated band practice room. Project includes LED lighting throughout and high efficiency HVAC systems.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |