Delivered via design-build, the $51 million TK-8th grade school was built on a 12-acre site by a partnership of JL Modular, Otto Construction and NMR Architects. Completed in 2021, the new two-story school features three buildings with 35 classrooms and an administration/ library building. It serves 850 students.
This project used permanent modular construction techniques, which combine the form and function of traditional site-built construction with the
speed and cost efficiency of the modular construction process. The steel-framed buildings were pre-fabricated in modular sections off-site that were transported to the site, erected and finished. This method helped shorten the overall construction schedule and kept costs down.
This new 4,500 square foot state-of-the-art college science building was built by a design-build partnership of JL Construction, along with JL Modular and Architect Brokaw Designs. The building is an L-shaped, steel-frame building with a chemistry teaching lab, chemistry prep room, chemistry instrument room and anthropology classroom; an all-gender restroom and extensive outdoor teaching areas.
The chemistry lab features five chemical fume hoods, safety showers and eyewash stations, gas/vacuum dual valves at each station, laboratory sinks, and a reverse osmosis de-Ionized (RODI) water system.
JLC was selected following a rigorous design-build competition. The modular approach by JLC ensured that the project was built quickly for less than conventional construction.
New permanent modular 8-classroom wing with associated science fixtures and casework. The building features four dedicated science classrooms with sinks and ceiling mounted power cords. There are four additional classrooms with partition walls for flexibility.
JL Construction, with its affiliate JL Modular, built the new 2-Story, 15,600 square foot modular building with 10 integrated science labs and 6 prep rooms. Support spaces include student and staff restrooms on both floors, electrical room, elevator, exterior stairs and balcony.
The building and related sitework and landscaping was installed and completed while school was fully operational.
Three new slab-on-grade modular classroom and administration buildings as part of a campus modernization for a middle school. Building design was JL Modular’s DSA prechecked design for faster approval.
The administration building houses reception, offices, a staff lounge, and a community room. One classroom building features four standard classrooms plus restrooms. The other classroom building has three science classrooms and a culinary arts classroom
Construction of three new modular classroom buildings including art, kindergarten and special education classrooms. The architect used JLM’s DSA prechecked design to ensure prompt Division of the State Architect approval and faster construction.
Construction of four 1-story modular classrooms, locker room, wood shop and art classroom buildings. The architect used JL Modular's DSA prechecked design to ensure prompt DSA approval, and faster construction.
JL Modular designed and built three classroom buildings at Stanley Middle School using its DSA prechecked design. Two buildings are configured to make an l-shape which converges around an established outdoor learning area. The other six classrooms are on the opposite side of the campus. The classroom types include general education and science with prep rooms, eye wash, movable furniture and science-specific countertops. The buildings also feature student and faculty restrooms and a conference room with partition wall for optional divider.
JL Construction, in partnership with JL Modular, designed and built a classroom building and multipurpose building for this K-8 school. The classroom building is a single story, 7200 square foot, permanent modular building including site work. Each of the six STEM classrooms is 1,100 square feet and features extensive daylighting and adjacent outdoor learning areas. The architect used JL Modular’s DSA prechecked design to ensure prompt DSA approval and faster construction. The new, 8,600 square foot modular multipurpose building features a 5,000 square foot assembly room, warming kitchen, changing rooms, restrooms and overhead doors that open to adjacent playgrounds. Site work included converting a field to two outdoor basketball courts, a new concrete amphitheatre, a play structure and lunch area.
Summit Shasta High School in Daly City, CA opened for students in August 2018. The school was built by JL Construction (JLC), in conjunction with JL Modular (JLM), with Artik Art & Architecture.
Summit Shasta is a new 400-student public charter high school on 2.5 acres in Daly City, CA, south of San Francisco.
JLC provided overall project management and utilities, parking and all outdoor learning spaces and landscaping while JLM provided the modular school buildings.
The campus has five 1-story modular buildings totaling 26,000 square feet. There are:
• 10 standard classrooms
• two science, technology, engineering and math (STEM) classrooms
• one special education classroom with associated office
• an administration space
• a large multipurpose building
The gym is large enough for a full basketball court plus bleachers as well as all-school gatherings.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |