Mabel Mattos Elementary School is a two building campus which is designed to be expanded to an 800-student elementary school.
The two-story steel frame buildings connected by a metal staircase were designed by AEDIS Architects and total 19,258 square feet.
The first phase features:
• A two-story modular classroom building with eight classrooms
• An adjacent two-story administration building
• All underground utilities for future phases
New 11,530 square foot, 8-classroom, modular building. The new building features a double-loaded corridor, restrooms and associated sitework. Classroom types include: standard, special education, and computer labs. Each classroom is equipped with a Front Row system that is connected to an 80” LED TV. This system allows the teachers to mirror the images on their computers with the TV’s to enhance the learning experience.
Design-build delivery of a new, modular, two-story visual and performing arts building featuring six standard classrooms, three studio art rooms, dance studio, ceramics studio with outside kilns, and associated restrooms and offices. JL Modular worked with the district and AEDIS Architects to design and build the new modular classroom building.
Design-build delivery of a new 11,000 square foot STEM building including, Science, Biology, Chemistry and Construction Technology Classrooms. Included restrooms, science prep rooms, chemical storage, double loaded corridor, large covered outdoor work area and covered entry. Plaster and Hardie exterior finish with storefront windows, sunshades and built up roof.
JL Modular developed this two-story modular 21st century classroom building totaling 10,880 square feet with eight classrooms, two science labs, teacher workroom and two accessible restrooms. The building is structural steel with metal stud framing, standing seam metal roof, stucco finish and tile exterior. The building features high ceilings and large windows with clerestory windows on the second floor, an exterior walkway with two stairways and an elevator. The exterior finish features a tile wainscot that wraps around the building to match the exterior of the existing school buildings.
The classroom building features the 21st century learning environment with encourages a collaborative learning environment. They utilize Nana Wall folding doors which open up two classrooms into a large innovative and adaptive learning area. The classrooms also have custom cabinetry with integrated teaching walls and a modern Audio Visual systems.
Construction of three new classroom buildings totaling 3,840 square feet. Includes two standard middle school classrooms and a music classroom including a large band room, instrument storage and sound attenuated band practice room. Project includes LED lighting throughout and high efficiency HVAC systems.
A unique collaboration between San Jose Evergreen Community College District, and Milpitas Unified School District, the new Joint Use 21st Century Education Center provides 13,000 square feet of new classrooms for high school and college students. The classrooms are designed around a central courtyard and a Hub, to foster collaboration and learning. High school students will use the building during the day and college students will use the building at night. The new building provides lecture classrooms, biology lab, robotics, technology and standard classrooms. Designed to be LEED Silver, the building incorporates several sustainable and efficient building systems.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |